9 - FIRST START-UP
Do not stand close to the boiler and ventilate the room as described. The smoke and smell of paint will disappear after about an hour of
operation, however, they are not harmful in any case.
The boiler will be subject to expansion and contraction during the lighting and cooling down stages, and may therefore make slight
creaking noises.
This is absolutely normal as the structure is made of laminated steel and must not be considered a defect.
It is extremely important to make sure the boiler does not reach high temperatures straight away, but to increase the temperature
gradually using low power at rst.
This will prevent damaging the ceramic or serpentine stone tiles, the welds and the steel structure.
DO NOT EXPECT HEATING EFFICIENCY IMMEDIATELY!!!
OPENING/CLOSING THE DOOR
CAUTION!
The door must be closed properly for the stove to work correctly.
Use suitable protective clothing (for example gloves) to open the door of the stove.
To open the door, insert the supplied hook into the hole and lift the handle (as in the gure).
SETTINGS TO BE CARRIED OUT BEFORE THE INITIAL START-UP
After connecting the power cable to the back of the product, turn the switch at the back to position(I). To turn the stove on or o, press
button 1 on the control panel.