EasyManuals Logo

Redring PURE 8.5kW User Manual

Redring PURE 8.5kW
20 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #8 background imageLoading...
Page #8 background image
8
Installation Guide
5. If rear entry pipe work is used we
recommend the use of a suitable sealant
to seal around the incoming pipe work to
prevent water entering the wall.
6. Turn on the mains water supply and check
for leaks, paying attention to the water inlet
connection. At this stage no water can ow
through the unit.
IMPORTANT: Remember to replace the lower
corner section before retting the front cover.
The shower back plate incorporates into the
lower right side a removable corner section
to allow easy access when deciding on and
connecting to the water mains supply.
1. Remove the bottom right hand side corner
section giving access to the water inlet
connection point.
IMPORTANT: Before connecting the mains
water supply to the shower ush out the pipe
work to remove all swarf and system debris.
This is achieved by connecting a suitable hose
(i.e. Garden hose) to the pipe work and turning
on the mains water supply at the isolating stop
tap long enough to clear the debris to waste.
2. Turn off the mains water supply at the
isolating stop tap.
3. Having decided on the direction of the water
inlet supply: Top (falling) Bottom (rising) or
rear / side inlet it is necessary to remove
the appropriate knock out (thinned out
plastic) cross section from the back plate
before commencing with the installation.
The connection to the unit is made using a
15mm copper, stainless or plastic pipe with
a 15mm compression elbow or 15mm push
t elbow.
IMPORTANT: Do not use excessive force
when making the connection to the unit.
4. Now tighten the back plate xing screws so
the unit is rmly xed to the wall.
IMPORTANT
Installation must comply with water regulations, building regulations, any specic local
water company regulations and should be in accordance with BS EN 806. A double
check valve must be tted with all exible shower accessories where it is possible that
the shower handset may come into contact with used water i.e. In the bath or shower
tray.
IMPORTANT
Before turning on the water supply to the shower unit the water supply pipe should be
ushed out to remove debris. After ushing the pipework ensure that the shower unit is
positioned squarely on the wall and tighten the screws. Tighten all plumbing connections
and check the pipework for leaks.
8. Plumbing Connections
Top cut-out section for mains
water and cable entry.
Bottom cut-out section for mains
water and cable entry.
Water inlet.
Side cut-out
section for mains
water entry only.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Redring PURE 8.5kW and is the answer not in the manual?

Redring PURE 8.5kW Specifications

General IconGeneral
BrandRedring
ModelPURE 8.5kW
CategoryPlumbing Product
LanguageEnglish

Related product manuals