31
31
8. Attach the gasket onto the trap
assembly so that the gasket
holes on the gasket line up with
the holes on the trap assembly.
9. Insert the trap assembly with
gasket up through the existing
hole in the jacket and secure
from inside the jacket. Use two
screws provided. Screw down
into the two “ears” molded into
either side of the trap. Snug the
trap assembly against the
furnace jacket compressing the
gasket slightly to eliminate any
air leaks. Do not
overtighten!
10. Attach the black molded rubber
90° elbow to the straight spout
on the trap top using a black
nylon clamp . Attach the other
end of the rubber elbow to the
spout located on the exhaust
transition using a black nylon
clamp.
11. Attach the end of the ribbed tube
to the 45° elbow molded into
the top of the trap assembly
using a black nylon clamp.
IMPORTANT: Tighten all clamp
connections with a pair of pliers
and check for leaks after
conversion is complete.
CONDENSATE DRAIN
FOR HORIZONTAL
INSTALLATION
Refer to Figure 32 for Steps 1-5.
1. This unit is shipped factory ready
for downflow
installation. The
condensate trap assembly and
drain hoses require conversion
for horizontal installation.
Remove the existing condensate
trap with the unit in the upright
position.
2. Remove the burner compartment
door from the unit.
3. Remove the two screws from the
right side of the furnace jacket
which support the trap mounting
bracket . Remove the two
plastic plugs on either side of the
trap outlet hole and discard.
4. Remove the (L-shaped) clear
vinyl drain tube from the top of
the existing trap .
Do not
disconnect the short end
from the furnace collector box.
5. Remove the ribbed drain tube
from the existing trap and the
exhaust transition . Discard this
tube. Retain the clamps for future
use. Additional clamps are
provided in the parts bag if any
clamps are damaged during
conversion process.
NOTE: The following steps should
take place with the furnace in the
horizontal position.
Refer to Figure 33 for Steps 6-11.
6. Locate the parts bag in the
burner compartment. Install two
plastic plugs in the side of the
jacket from bottom side up.
7. Fill the trap assembly with 1/2
cup of water.
FIGURE 31
DOWNFLOW CONDENSATE DRAIN
I408
11
CONDENSATE TRAP
DRAIN LINE
NEUTRALIZER CARTRIDGE
(OPTIONAL)
TO FLOOR DRAIN OR CONDENSATE PUMP
NOTE:
SEE GENERAL NOTES FOR
HORIZONTAL MODELS
FOR PIPE HEIGHT.
OVERFLOW LINE
(REQUIRED ONLY WHEN
OPTIONAL NEUTRALIZER
CARTRIDGE IS USED.)
12. IMPORTANT: There are two
options when choosing a height
for the condensate riser:
CONDENSATE OVERFLOW:
With a 1
3
4 inch riser installed
above the tee, a blocked drain
will result in overflow from the
riser.
FURNACE SHUTDOWN: To
cause the furnace to shut down
when a blocked drain is present,
install a riser which is a minimum
of 5
1
2”. If the furnace is installed
in an attic, crawlspace or other
area where freezing
temperatures may occur, the
furnace drain can freeze while
shut off for long periods of time.
Use a solvent cement that is
compatible with PVC material.
CONVERTING DOWNFLOW TO HORIZONTAL