EasyManuals Logo

Rheem 90RT07EES Series User Manual

Rheem 90RT07EES Series
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #30 background imageLoading...
Page #30 background image
30
F
IGURE 22
S
TANDARD VERTICAL DIRECT VENTING
U
PFLOW MODEL SHOWN (TYPICAL FOR DOWNFLOW MODELS)
FIGURE 23
STANDARD HORIZONTAL DIRECT VENTING
UPFLOW MODEL SHOWN (TYPICAL FOR DOWNFLOW MODELS)
I
407
3
" MAX.
SEPARATION
COMBUSTION AIR
P
IPE
12" MIN.
S
EPARATION
12" MIN. ABOVE
R
OOF LEVEL
ROOF LINE
EXHAUST PIPE
COMBUSTION AIR PIPE
SUPPLY AIR
RETURN AIR
EXHAUST VENT
3
"
MAX.
EXHAUST
V
ENT
R
OOF LINE
COMBUSTION
A
IR PIPE
12"
MIN.
12" MIN.
ANTICIPATED
S
NOW LEVEL
COMBUSTION
A
IR PIPE
3
"
MAX.
EXHAUST
V
ENT
12"
MIN.
12" MIN.
3
"
M
A
X.
1
2
"
M
I
N
.
1
2
"
M
I
N
.
A
B
O
VE
A
N
T
I
C
I
PA
T
ED SN
O
W L
EVEL
5
NOTES:
1
THE COMBUSTION AIR PIPE MUST
TERMINATE IN THE SAME PRESSURE
Z
ONE AS THE EXHAUST PIPE.
2
I
NCREASE THE 12-IN. MINIMUM
TO KEEP TERMINAL OPENING
ABOVE ANTICIPATED LEVEL OF
S
NOW ACCUMULATION WHERE
APPLICABLE.
3
W
HEN 3-IN. DIAM. PIPE IS USED,
REDUCE TO 2-IN. DIAMETER BEFORE
P
ENETRATING ROOF. A MAXIMUM OF
18 IN. OF 2-IN. PIPE MAY BE USED
BEFORE PASSING THROUGH ROOF.
4
SUPPORT VERTICAL PIPE EVERY 6
FEET.
5
EXHAUST TERMINATION - TERMINATE
T
HE LAST 12 INCHES WITH 2 PVC PIPE
ON 90,000 AND 120,000 BTUH MODELS.
REDUCE AND TERMINATE THE LAST
1
2 INCHES WITH 1
1
/2
PVC PIPE ON
45,000 THROUGH 75,000 BTUH
MODELS. SEE DETAIL A.
6
30” MAXIMUM EXPOSED VENT
L
ENGTH.
PITCHED ROOF INSTALLATIONS
NOTES:
1
SUPPORT HORIZONTAL PIPE
EVERY FOUR FEET.
2
WHEN 3 IN. PIPE IS USED REDUCE TO 2 IN.
BEFORE PENETRATING OUTSIDE WALL.
3
18 IN. MAXIMUM. 2 IN. DIAMETER PIPE MAY
BE USED INSIDE THE WALL.
4
DETAIL “A” - EXHAUST TERMINATION
TERMINATE THE LAST 12 INCHES WITH 2
PVC PIPE ON 90,000 AND 120,000 BTUH
MODELS. REDUCE AND TERMINATE THE
LAST 12 INCHES WITH 1
1
/2 PVC PIPE ON
45,000 THROUGH 75,000 BTUH MODELS.
5
INCREASE THE 12 IN. MINIMUM ABOVE
GRADE TO KEEP TERMINAL OPENINGS
ABOVE ANTICIPATED LEVEL OF SNOW
ACCUMULATION WHERE APPLICABLE.
6
DETAIL “B”, INSTALL WIND DEFLECTOR
VANE IN 2 IN. PVC COUPLING IN VERTICAL
POSITION USING PVC SOLVENT.
THE COMBUSTION AIR TERMINATION MUST
BE IN THE SAME PRESSURE ZONE AS THE
EXHAUST TERMINATION.
3
12
4
4
SEE DETAIL A
VANE
2 PVC
COUPLING
12 MIN. ABOVE
GRADE LEVEL
5
SEE DETAIL B
2 OR 3 TEE
W/DRAIN TRAP
RETURN AIR
TRAP
SUPPLY AIR
EXHAUST PIPE
COMBUSTION AIR PIPE
CONNECT
TO DRAIN
12
4
EXHAUST
INTAKE
OPTIONAL
INTAKE
DETAIL C
EXHAUST / INTAKE RELATIONSHIP
EXHAUST TERMINATION
DETAIL A
COMBUSTION AIR TERMINATION
DETAIL B
1
2
3
I407
4
5
5
5
12
4
6
1
2
3
EXHAUST
T
ERMINATION
DETAIL A
30 MAX
30 MAX

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Rheem 90RT07EES Series and is the answer not in the manual?

Rheem 90RT07EES Series Specifications

General IconGeneral
BrandRheem
Model90RT07EES Series
CategoryFurnace
LanguageEnglish

Related product manuals