EasyManua.ls Logo

Rheem 97MDV060 Series - Page 34

Rheem 97MDV060 Series
108 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
34
ST-A1194-18-XO
DETAIL A
DIRECT VENT (cont.)
GENERAL VENTING REQUIREMENTS AND
GUIDELINES
Figure 17 below shows the necessary detail for the roof penetration on a standard direct-vent vertical termination.
*3” (8cm) minimum only if no snow accumulation is anticipated.
Venting
Terminations more than 24”
above roof penetration re-
quire additional support.
*
12” (31cm) U.S.
CANADA: TERMINATIONS
MUST CONFORM TO
CSA B149.1-10, SECT. 8.14
48” MAX.
(122 cm)
45” MAX.
(114 cm)
36” MAX.
(91 cm)
3” MIN.
(8 cm)
NOTE: IF 3 Ø VENTING IS
USED, BOTH PIPES (INTAKE
AND EXHAUST) MUST BE
REDUCED TO 2 Ø BEFORE
PENETRATING ROOF.
FIGURE 17
D
IRECT VENT VERTICAL TERMINATION DETAIL

Related product manuals