EasyManua.ls Logo

Rheem 97MDV060 Series - Page 41

Rheem 97MDV060 Series
108 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
41
Venting
M
U
L
T
I
V
E
N
T
I
N
G
O
F
D
I
R
E
C
T
-
V
E
N
T
F
U
R
N
A
C
E
S
G
E
N
E
R
A
L
V
E
N
T
I
N
G
R
E
Q
U
I
R
E
M
E
N
T
S
A
N
D
G
U
I
D
E
L
I
N
E
S
TWO-PIPE VENTING
T
HROUGH ROOF
TWO-PIPE VENTING
THROUGH WALL
3” (8cm) MIN.
1
2” (32cm) MAX.
COMBUSTION
AIR INTAKE
2” PVC
8/20cm
MIN.
S
EE DETAIL
“A”
12”/31cm MIN. ABOVE
GRADE OR HIGHEST
ANTICIPATED SNOW LEVEL.
CANADA: MUST CONFORM TO
CSA B149.1-10, SECT. 8.14
A
See
T
WO-PIPE VENTING
THROUGH ROOF
TWO-PIPE VENTING
T
HROUGH WALL
3”/8cm
MAX.
TERMINATIONS
M
UST BE GREATER
T
HAN 8 APART.
C
OMBUSTION
AIR INTAKE
2” PVC
8”/20cm
MIN.
SEE DETAIL
“A”
12”/31cm MIN. ABOVE
GRADE OR HIGHEST
ANTICIPATED SNOW LEVEL.
CANADA: MUST CONFORM TO
CSA B149.1-10, SECT. 8.14
Figures 27 & 28: NOTE: WHEN VENTING MULTIPLE FURNACES IN CLOSE PROXIMITY, EACH FURNACE MUST
BE INDIVIDUALLY VENTED – NO COMMON VENTING IS PERMITTED. See Figures 27 & 28 for positioning of the
terminations. When more than two furnaces are to be vented, there must be at least 4 feet between the first two fur-
naces and the third and etc. Figure 27, (Detail A) below shows the necessary detail for the roof penetration on a stan-
dard direct-vent vertical termination.
MINIMUM 12”/31cm IN
U.S. ABOVE AVERAGE
SNOW ACCUMULATION.
MAXIMUM OF 24”/61cm
ABOVE ROOF.*
6 (1.8m) MINIMUM
10 (3m) RECOMMENDED
A
A
SEE
SEE
MINIMUM 12”/31cm
ABOVE GRADE IN U.S.
*
*
12” (31cm) U.S.
CANADA: TERMINATIONS
MUST CONFORM TO
CSA B149.1-10, SECT. 8.14
48” MAX.
(122 cm)
45” MAX.
(114 cm)
36” MAX.
(91 cm)
3” MIN.
(8 cm)
MINIMUM 12”/31cm IN
U.S. ABOVE AVERAGE
SNOW ACCUMULATION.
MAXIMUM OF 24”/61cm
ABOVE ROOF.*
6’ (1.8m) MINIMUM
10’ (3m) RECOMMENDED
A
A
SEE
SEE
MINIMUM 12”/31cm
ABOVE GRADE IN U.S.*
ST-A1194-18
DETAIL A
ST-A1194-21
ST-A1194-22
DETAIL A
CONCENTRIC VENTING THROUGH ROOF
CONCENTRIC VENTING THROUGH WALL
TWO PIPE VENTING THROUGH ROOF
TWO PIPE VENTING THROUGH WALL
DIRECT VENT VERTICAL TERMINATION DETAIL
*3” (8cm) minimum only if no snow accumulation is anticipated.
*CANADA: TERMINATION MUST CONFORM TO CSA B149.1-10,
SECT 8.14.
ST-A1194-22
2 FURNACES
Terminations must be greater than 8” apart.
Terminations must be less than 24” apart or greater than
36apart.
3rd OR MORE FURNACES
Each additional termination must be greater than 48” from
the previous termination.
A
T
ERMINATIONS MORE THAN
24” ABOVE ROOF PENETRA-
TION REQUIRE ADDITIONAL
SUPPORT.
A
NOTE: IF 3 Ø
VENTING IS USED,
BOTH PIPES (INTAKE
AND EXHAUST) MUST
BE REDUCED TO 2 Ø
BEFORE PENETRATING
ROOF.
NOTE: IF 3 Ø
VENTING IS
USED, BOTH
PIPES (INTAKE
AND EX-
HAUST) MUST
BE REDUCED
TO 2 Ø
BEFORE
PENETRATING
ROOF.
FIGURE 27
T
WO FURNACE VENTING
FIGURE 28
T
WO FURNACE VENTING WITH CONCENTRIC VENTING

Related product manuals