EasyManua.ls Logo

Riello 20114905 User Manual

Riello 20114905
168 pages
Go to English
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
IT - MANUALE PER L’INSTALLATORE E L’UTENTE
EN - INSTALLER AND USER MANUAL
FR - MANUEL D’INSTALLATION ET D’UTILISATION
PT - MANUAL DO USUÁRIO E DO INSTALADOR
HU - TELEPÍTŐI ÉS FELHASZNÁLÓI KÉZIKÖNYV
RO - MANUAL DE INSTALARE SI UTILIZARE
SR - UPUTSTVO ZA MONTAŽERA I KORISNIKA
HR - PRIRUČNIK ZA INSTALATERE I KORISNIKE
SL - NAVODILA ZA VGRADITEV, PRIKLJUČITEV IN UPORABO
EL - ΕΓΧΕΙΡΙΔΙΟ ΕΓΚΑΤΑΣΤΑΤΗ ΚΑΙ ΧΡΗΣΤΗ
Start Condens 25 - 29 Kis

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Riello 20114905 and is the answer not in the manual?

Riello 20114905 Specifications

General IconGeneral
BrandRiello
Model20114905
CategoryBoiler
LanguageEnglish

Summary

Safety and General Warnings

General Warnings

Provides essential safety guidelines for boiler operation and installation.

Basic Safety Rules

Outlines fundamental safety precautions to prevent hazards during use.

Installation Procedures

Boiler Installation Guidelines

General rules and considerations for correctly installing the boiler unit.

Electrical Wiring Connections

Instructions for connecting the boiler to the electrical supply and control systems.

First Commissioning Preparation

Pre-operation checks and preparations required before the initial start-up.

Pre-Commissioning Control Steps

Essential checks to perform before activating the boiler for the first time.

Post-Commissioning Operational Checks

Verifying the boiler's performance and shutdown after initial commissioning.

Adjustments and Calibration

Gas Valve Calibration Procedures

Detailed steps for calibrating the gas valve for optimal performance and output.

Performance and Configuration

Setting the Rated Heating Output

Instructions for adjusting the boiler's maximum heating output to system requirements.

Gas Type Conversion Process

Guidance on converting the boiler to operate with different types of gas.

Commissioning and Operation Modes

General Commissioning Procedure

Steps for initial start-up and functional testing of the boiler.

Display and Fault Code Diagnostics

Fault Code Identification and Reset Procedures

Guide to understanding error codes displayed and how to reset them.

Maintenance and Troubleshooting

Periodic Maintenance Requirements and Procedures

Outlines the necessary maintenance tasks for boiler efficiency and longevity.

Electrical Connections and Diagrams

Electrical Wiring Diagrams and Schematics

Detailed electrical connection diagrams for the boiler and its accessories.