EasyManua.ls Logo

Riello Start Condens 25 IS User Manual

Riello Start Condens 25 IS
52 pages
Go to English
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
IT - MANUALE PER L’INSTALLATORE E L’UTENTE
EN - INSTALLER AND USER MANUAL
HU - TELEPÍTŐI ÉS FELHASZNÁLÓI KÉZIKÖNYV
Start Condens 25 IS
Question and Answer IconNeed help?

Do you have a question about the Riello Start Condens 25 IS and is the answer not in the manual?

Riello Start Condens 25 IS Specifications

General IconGeneral
BrandRiello
ModelStart Condens 25 IS
CategoryBoiler
LanguageEnglish

Summary

Warnings and Safety

General Warnings

General safety precautions and user responsibilities for boiler operation.

Basic Safety Rules

Essential safety guidelines, prohibitions, and user conduct to prevent accidents.

Boiler Description

Overview of the START CONDENS IS boiler type and its operational modes.

Installation

Receiving the Product

Procedures and materials for unpacking and verifying the boiler upon delivery.

Installation Room

Requirements for installation room, including ventilation and clearances.

Installation on Old or Updated Appliances

Checks for installing the boiler in existing or refurbished systems.

Water Characteristics of the DHW System

Guidelines on water quality and requirements for DHW system connections.

Boiler Installation

Methods for installing the boiler indoors, outdoors, or in a built-in box, including anti-freeze.

Installing the External Probe (Accessory)

Instructions for mounting and connecting the external probe for climate control.

Electrical Wiring

Steps for connecting the boiler to power supply, ambient thermostat, and terminals.

Boiler Configuration

Configuring the boiler using jumpers on the electronic board for system settings.

Gas Connection

Procedures and safety checks for connecting the boiler to the gas supply.

Flue Gas Outlet and Combustion Air Suction

Specifications and guidelines for flue gas discharge and air intake pipe installations.

System Loading and Emptying

Instructions for filling and draining the heating system and boiler.

First Commissioning Preparation

Essential checks and preparations before the initial start-up and functional testing.

Control Prior to Commissioning

Crucial checks for the condensate siphon before the boiler's first operational run.

Checks During and After First Commissioning

Procedures for verifying correct operation after start-up, including gas pressure & combustion checks.

Setting the Thermoregulation

Setting up and adjusting the thermoregulation function with an external probe.

Adjustments

Thermoregulation Curves

Thermoregulation curves for different system types and temperature adjustments.

Gas Valve Calibration

Steps for calibrating the gas valve for maximum/minimum output and slow ignition.

Commissioning

Winter Mode Operation

Boiler operation in winter mode for heating and domestic hot water production.

Heating Temperature Control (H.T.C.)

Explanation of HTC function for self-adjusting heating water temperature.

Reset Function

Procedure to restore normal operation by resetting boiler functions.

Temporary Switch-off

Setting the boiler for temporary absence, including antifreeze protection.

Switching Off for Lengthy Periods

Instructions for safely shutting down the boiler for extended periods.

Display and Fault Codes

Fault Code Explanations

Descriptions and troubleshooting steps for various fault codes displayed by the boiler.

Maintenance

Boiler Cleaning

Procedures for cleaning boiler components to ensure optimal performance.

Technical Data

Multigas Table

Technical specifications for different gas types (Methane, Propane).

ErP Data Table

Energy-related Product (ErP) data, including efficiency classes and consumption.

Data Plate Information

Control Panel Overview

Hydraulic Circuit Description

Electrical Wiring Diagram

Low Voltage and Ambient Thermostat Connections

Circulator Operation

Related product manuals