EasyManua.ls Logo

Riello Residence Condens KIS n User Manual

Riello Residence Condens KIS n
236 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Residence Condens KIS n
EN - INSTALLER AND USER MANUAL
FR - MANUEL DE L’INSTALLATEUR ET DE L’UTILISATEUR
PT - MANUAL DO INSTALADOR-MANUAL DO USUÁRIO
HU - TELEPÍTŐIÉSFELHASZNÁLÓIKÉZIKÖNYV
RO - MANUALDEINSTALAREŞIUTILIZARE
DE - BEDIENUNGS- UND INSTALLATIONSANLEITUNG
SL - PRIROČNIKZAMONTAŽOINUPORABO
HR - PRIRUČNIKZAINSTALATEREIKORISNIKE
GR - ΕΓΧΕΙΡΙΔΙΟΕΓΚΑΤΑΣΤΑΤΗΚΑΙΧΡΗΣΤΗ
BG - РЪКОВОДСТВОЗАУПОТРЕБАИМОНТАЖ

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Riello Residence Condens KIS n and is the answer not in the manual?

Riello Residence Condens KIS n Specifications

General IconGeneral
TypeCondensing Boiler
NOx Class5
Warranty2 years
Fuel TypeNatural Gas
Efficiency (%)Up to 98%
Dimensions (HxWxD)700x400x300 mm

Summary

1 - WARNINGS AND SAFETY

2 - DESCRIPTION

3 - INSTALLATION

3.1 Receiving the product

Check boiler packaging and contents for integrity and completeness.

3.2 Cleaning the system/characteristics of the heating circuit water

Details on heating system cleaning and requirements for heating circuit water.

3.3 Boiler installation

Instructions for mounting the boiler and its pre-assembly template on the wall.

3.4 Hydraulic connections (fig. 6-7-8)

Guide to connecting the boiler's water, gas, and hydraulic pipelines correctly.

3.5 Installing the external probe (fig. 10)

3.6 Gas connection

3.9 Eliminating the air from the heating circuit and boiler (fig. 18)

3.10 Flue gas outlet and combustion air suction (fig. 19)

3.11 Installation of collective positive pressure smoke pipes

4 - COMMISSIONING

4.1 First commissioning preparation

Essential checks and preparations before the initial start-up of the boiler.

Possible blocking of the circulator shaft (fig. B)

Procedure to resolve a seized circulator shaft.

4.2 First commissioning

Steps for initial boiler start-up, including filling the condensate siphon.

Adjusting the heating water temperature (fig. I)

Adjusting the heating water temperature with an external probe connected

Adjustment of the domestic hot water temperature (fig. J)

Boiler start-up (fig. K)

Reset function (fig. L)

4.3 Temporary switch-off

4.4 Switching off for lengthy periods

4.5 Circulator setting

Indication of the alarm status

How to interpret LED indicators for circulator alarm conditions and potential remedies.

Display of the active settings

How to view the current circulator configuration using the LED indicators.

Key lock function

How to enable or disable the circulator's key lock function to prevent accidental changes.

4.6 Bypass replacement (fig. 30)

4.7 Light signals and faults

4.8 Boiler configuration (fig. 35-36)

Explanation of jumpers on the control board for configuring boiler system settings.

4.9 Setting the thermoregulation

Guide to selecting and adjusting heating thermoregulation curves for optimal performance.

4.10 Maintenance

4.11 Adjustments

GAS VALVE CALIBRATION

Procedure for calibrating the gas valve to ensure correct combustion parameters.

4.12 Gas conversion

4.13 Combustion check

5 - SERIAL NUMBER

A - General warnings

Basic safety rules

Fundamental safety rules for operating the boiler, including prohibitions and emergency actions.

C - Commissioning

Procedure for initial boiler start-up and checks performed by authorized personnel.

D - Adjusting the heating water temperature

E - Adjusting the heating temperature with an external probe connected

F - Adjustment of the domestic hot water temperature

G - Temporary switch-off

I - Maintenance

J - Display and fault codes

K - Cleaning

TECHNICAL DATA

[EN] - Constant residual discharge head curve

[EN] - Possible discharge configurations

[EN] - THERMOREGULATION CURVES

[EN] - CLIMATIC CURVE CORRECTION

Related product manuals