EasyManua.ls Logo

Riello RESIDENCE 40 KIS User Manual

Riello RESIDENCE 40 KIS
264 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
RESIDENCE KIS
EN - INSTALLER AND USER MANUAL
RO - MANUAL DE INSTALARE SI UTILIZARE
HU - BESZERELÉSI ÉS FELHASZNÁLÓI KÉZIKÖNYV
PT - MANUAL DO USUÁRIO E DO INSTALADOR
EL - ΕΓΧΕΙΡΙΔΙΟ ΕΓΚΑΤΑΣΤΑΤΗ ΚΑΙ ΧΡΗΣΤΗ
BG - РЪКОВОДСТВО ЗА ИНСТАЛИРАНЕ И ЕКСПЛОАТАЦИЯ

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Riello RESIDENCE 40 KIS and is the answer not in the manual?

Riello RESIDENCE 40 KIS Specifications

General IconGeneral
Fuel TypeGas
Heat Output40 kW
Max working pressure3 bar
FuelNatural gas / LPG
Electrical supply230 V, 50 Hz

Summary

EN - INSTALLER AND USER MANUAL

1 WARNINGS AND SAFETY

General Safety Precautions

Provides essential safety information for users and installers.

Safety Reminders

Highlights critical safety rules and procedures to follow.

2 DESCRIPTION

3 INSTALLATION

3 INSTALLATION (Continued)

Condensate Drain Pipe Installation

Instructions for installing the condensate drain pipe correctly.

Gas Connection

Procedure for connecting the boiler to the gas supply.

Boiler Positioning and Hydraulic Connections

Guidance on mounting the boiler and making hydraulic connections.

Filling the Heating System and Eliminating Air

Procedure for filling and venting the heating system.

Electrical Connections

Instructions for making the necessary electrical connections.

Flue Gas Exhaust and Combustion Air Suction

Information on connecting flue and air intake systems.

3.20 Control panel

SETTINGS MENU TREE STRUCTURE

SETTINGS MENU TREE STRUCTURE (Continued)

3.21 Access to the parameters

Installer Access Level

Procedure for accessing installer-level parameters.

Service Access Level

Procedure for accessing service-level parameters.

4 COMMISSIONING

Preliminary Checks

Essential checks before initial startup of the boiler.

Boiler Programming

Steps for programming the boiler's basic settings.

Time Band Scheduling (Room Thermostat)

How to set heating schedules using a room thermostat.

4.4 Boiler configuration

4.4 Boiler configuration (Continued)

4.5 Setting the thermoregulation

Selecting Compensation Curves

Guidance on choosing appropriate compensation curves.

4.6 First commissioning

4.7 Operating status

8.2 Adjusting Heating Water Temperature (No Outdoor Sensor)

8.3 Adjusting Heating Water Temperature (With Outdoor Sensor)

8.4 Adjusting Domestic Hot Water Temperature

8.5 Safety stop

8.6 Reset function

4.16 Checks during and after first commissioning

4.17 Combustion check

4.18 Gas conversion

4.19 Range rated

4.20 Lights and faults

Boiler Faults List

List of error codes and their descriptions.

Combustion Faults List

List of combustion-related error codes and descriptions.

4.28 Combustion Control Parameters

5 MAINTENANCE AND CLEANING

Cleaning the Primary Heat Exchanger

Procedure for cleaning the primary heat exchanger.

Cleaning the Burner

Instructions for cleaning the boiler's burner.

Ionisation Electrode Maintenance

6 CONTROL PANEL

Control Panel Buttons and Functions

Detailed explanation of each button and its function on the control panel.

7 PROGRAMMING THE BOILER

8 FIRST COMMISSIONING

Operating Status

Information on changing the boiler's operating status.

8.8 Time band scheduling function (room thermostat)

9 MALFUNCTIONING

Reset Function for Malfunctions

Procedure for resetting the boiler after a malfunction.

Fault E041

Fault E060

Fault E091

Boiler Faults List

Combustion Faults List

TECHNICAL DATA

TECHNICAL DATA (Continued)

Emission Values

Specifications for emission values like CO, NOx, and CO2.

Boiler Operating Elements

Component List

A comprehensive list of all boiler components with descriptions.

Multiwire wiring diagram

Hydraulic circuit

Residual head of circulator

MAX LENGTH PIPES Ø80 + Ø80

Chimney for ducting ø 50 mm or ø 60 mm or ø 80 mm

THERMOREGULATION CURVES

Related product manuals