INSTALLATION
− Fit the top panels (13, 14, 15 and 16)
16
15
13
− Fix the front panels (17) and (18) in place and t the side
proles (19).
19
19
17
19
RTC 8000-RTC 10000
Proceed as follows to t the boiler casing panels:
− Push out the pre-formed cutouts in the side panel (3) or
(4) (depending on what side you want to install the con-
trol panel) corresponding to the oval cable grommets in the
control panel. The control panel is not supplied.
4
3
− Fit four AVP pins in the holes in the rear of the panels 7 and
8 (two per panel).