39
INSTALLATION
− Fit the side panels (1, 2, 3, 4, 5, 6, 7 and 8) over the boiler's
top proles.
1
3
7
5
4
6
8
2
− Fit eight AVP pins in the holes in the front of the panels 9,
10, 11 and 12 (two per panel) and t the top panels
11
9
10
12
− Fit the top rear panel (13) over the pins provided.
− Fit four AVP pins to the bottom rear panel (14), t the panel
and x it in place with two self-tapping screws.
14