EasyManua.ls Logo

Roca AVO-507F-AG User Manual

Roca AVO-507F-AG
48 pages
Go to English
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
1
E
Condensadoras frío y bomba de calor
Instrucciones de instalación
○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○
3 - 10
GB
Cool and heat pump condensing units
Installation Instructions
○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○
11 - 15
F
Unités de condensation froid et réversibles
Instructions d'installation
○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○
16 - 20
P
Condensadoras de frio e bomba de calor
Instruções de Instalação
○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○
21 - 25
I
Unità esterne a raffreddamento e pompa di calore
Istruzioni per l'installazione
26 - 30
○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○
D
Kühlen und Wärmepumpen-Verflüssigergeräte
Hinweise zum Einbau
31 - 35
○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○
NL
Condensing-units koeling en warmtepomp
Installatie-instructies
36 - 40
○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○
N
Kondensatorer kulde og varmepumpe
Installasjonsinstrukser
41 - 45
○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○
Ref: N-40127 0307M
CGM-97/013
ISO 14001
ER-0028/1991
ISO 9001
AVO - 507F-AG, 510F-AG, 512F-AG
AVO - 504AG, 505AG, 507AG,
510AG, 512AG, 516AG
Question and Answer IconNeed help?

Do you have a question about the Roca AVO-507F-AG and is the answer not in the manual?

Roca AVO-507F-AG Specifications

General IconGeneral
BrandRoca
ModelAVO-507F-AG
CategoryHeat Pump
LanguageEnglish

Summary

General Dimensions

Technical Specifications

Installation Instructions

Inspection and Safety

Check unit upon reception for damage, ensure qualified installation, and follow safety regulations.

Location and Clearances

Install directly outdoors on a stable base with adequate air circulation and access space.

Refrigerant Circuit and Tubing

Ensure leakproof connections, use short, insulated copper tubing, and maintain specified diameters.

Evacuation, Dehydration, and Limits

Eliminate air/moisture, perform vacuum tests, and adhere to operating temperature and voltage limits.

Drain Installation

Drain Design and Installation

Install drain with slope, ensure leak-free joints, insulate, and secure tubing properly.

Checking Drain System

Verify water flow and absence of leaks after installation and before furnishing.

Wall Remote Control Installation

Cable Connections

Power Supply and Wiring

Check voltage, use correct cables, ensure proper grounding, and keep cables away from moving parts.

Connecting Control Cables

Connect wall remote control unit signal cables to the indoor unit board, avoiding interference.

Wiring Diagrams

Troubleshooting

Maintenance

Daily Maintenance

Clean air filter regularly and disconnect power before cleaning the unit.

Seasonal Maintenance

Check air intakes/outlets, grounding, and filter installation before/after seasons.

CE Declaration of Conformity

Related product manuals