Do you have a question about the Ross CDA-50 and is the answer not in the manual?
Specifies the requirement for a level floor and adequate ceiling height for installation.
Details safe handling procedures for lifting and rigging the mixer assembly.
Guides on placing, leveling, and shimming the mixer and mix can for proper alignment.
Outlines electrical specifications and installation guidelines, including safety checks.
Details checking and filling oil/fluid levels for mechanical seals, bearings, and hydraulic systems.
Covers attaching the mix can and installing grounding cables.
Describes the location and connection of the thermocouple and thermowell.
Recommends grounding cables to dissipate static charges.
Explains the manual operation of the air/oil hydraulic lift system for raising and lowering.
Details how to securely attach the mix can to the mixer.
Describes controlling agitator speeds using VFDs via the control panel.
Outlines the stages and techniques for effective wet mixing operations.
Explains using vacuum to remove air and increase evaporation during mixing.
Provides detailed steps for replacing Agitator Shaft FlexiLip Seals on vacuum-rated mixers.
Details procedures for replacing and maintaining single mechanical seals.
Covers lubrication and replacement of upper and lower bearings.
Specifies the schedule and procedure for changing gear oil in the reducer.
Guides on replacing the chevron style main packing in the hydraulic lift cylinder.
Lists specifications for lubricants used in the machine, including reducer, bearings, and seals.