EasyManua.ls Logo

Roundup ES-1200 - Installation; Unpacking; Equipment Setup

Roundup ES-1200
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EGG STATION (ES-1200)
6
A.J. Antunes & Co.
P/N 1011119 Rev. B 03/12
WARNING

FAILURE TO FOLLOW THE INSTRUCTIONS IN


 
 

installed by a qualified electrician.
 
appliance.
 
-

receptacle with separate electrical lines, pro-

rating.
 
unsure if the appliance is properly grounded.

1. Remove unit and all packing materials from
shipping carton.
NOTE: If any parts are missing or damaged,

630-784-1000.
2. Remove information packet.
3. Remove all packing materials and protective
coverings from the unit.
4. Wipe all surfaces of the unit with a hot damp
cloth.

out before use.
5. Clean the Service Pans and Side Panel in hot,
soapy water. Rinse in clear water and allow to air
dry.
6. Reassemble all parts to unit.
CAUTION

accordance with local electrical codes and any
other applicable codes.
Equipment Setup
When placing the unit into service, pay attention to the
following guidelines:
• Makesurepowerisoffandtheunitisatroom
temperature.
• DoNOTblockorcoveranyopeningsontheunit.
• DoNOTimmersecordorpluginwater.
• Keepcordawayfromheatedsurfaces.
• DoNOTallowcordtohangoveredgeoftableor
counter.
• Placetheunitonasturdy,leveltableorother
work surface. Turn off the power before
proceeding.
• Ensuretheunitislevelandadjustthelegsas
needed.
• Ensurethatthelinevoltagecorrespondstothe
stated voltage on the unit’s specification label. If
unsure, have an electrician confirm correct line
voltage before connecting unit.
• A hood may be required. Please consult with your
local health and safety officials prior to installation.
INSTALLATION
IMPORTANT





