EasyManua.ls Logo

RS 21 - Page 12

RS 21
95 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10
4.2 - Adding the Spinnaker Pole
e)
f)
Continue to push the pole into the boat, making sure it passes
underneath the webbing strap (feeding the tack line through rst).
Shackle the 40mm block to the metal hoop on the front
of the mast step.
d)
Pass the aft end of the pole in through the
opening at the bow of the boat (You will
need to feed the tack line in rst).
Continue to add the tack line as shown on the following page.

Related product manuals