EasyManuals Logo

Ruijie Reyee RG-RAP6260 User Manual

Ruijie Reyee RG-RAP6260
26 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #18 background imageLoading...
Page #18 background image
·
4 System Debugging
4.1 Setting up a Debugging Environment
Power on the AP through PoE.
Setting up the Environment
Verify that the AP is properly connected to the power source.
When the AP is connected to a PC for debugging, verify that the PC and PoE switch are properly grounded.
4.2 Powering up the AP
Checking before power-up
Verify that the power supply is properly connected.
Verify that the input voltage matches the specification of the AP.
Checking after power-up (recommended)
After powering up, it is recommended that you check the following to ensure normal operation of the AP.
Check if the LED works normally.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Ruijie Reyee RG-RAP6260 and is the answer not in the manual?

Ruijie Reyee RG-RAP6260 Specifications

General IconGeneral
BrandRuijie
ModelReyee RG-RAP6260
CategoryWireless Access Point
LanguageEnglish

Related product manuals