EasyManuals Logo

Runxin 63518 User Manual

Runxin 63518
51 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #33 background imageLoading...
Page #33 background image
MODEL: 63518-N77A1 /63618-N77A3/ 53518-N77B1
30
3.4. Parameter settlement
Service time T1
Water treatment capacity
Q=V
R
×K÷Y
D
m
3
Hardness of inlet water (mmol/L)
Exchange factor (mmol/L) 400~1000.
Down-flow regeneration, take
400~750. Up-flow regeneration, take
450~1000. If the inlet water hardness
is higher, the factor is smaller.
Resin volume( m
3)
By hours: T1=Q÷Q
h
Hour
Water treatment capacity per hour (m
3
/h)
Water treatment capacitym
3
By daysT1=Q÷Q
d
Day
Water treatment capacity per day (m
3
/d)
Water treatment capacity (m
3
)
Backwash time T2
It is subject to the turbidity of inlet water. Generally, It is suggested to
be set 10~15 minutes. The higher the turbidity is, the longer backwash
time can be set. However, if the turbidity is more than 5 FTU, it should be
better to install a filter in front of the exchanger.
Brine& slow rinse time T3
T3=(40~50)×H
R
min.
Generally, T3=45H
R
min.
In this formula, H
R
——The height of resin in exchange tank (m.)
Brine refill timeT4
Down-flow regenerationT40.45×V
R
÷Brine refill speed (min.)
Up-flow regenerationT40.34×V
R
÷Brine refill speed (min.)
In this formula, V
R
—— Resin volume (m
3
)
The Brine refill speed is related to inlet water pressure. It is

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Runxin 63518 and is the answer not in the manual?

Runxin 63518 Specifications

General IconGeneral
BrandRunxin
Model63518
CategoryControl Unit
LanguageEnglish

Related product manuals