EasyManua.ls Logo

Ruud RHPBZR Series - User Manual

Ruud RHPBZR Series
23 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
INSTALLATION INSTRUCTIONS
PACKAGED HEAT PUMPS FEATURING
EARTH-FRIENDLY R-410A REFRIGERANT
RHPBZR (2-5 TONS) 13.4 SEER2
92-108851-01-00
Question and Answer IconNeed help?

Do you have a question about the Ruud RHPBZR Series and is the answer not in the manual?

Summary

I. SAFETY INFORMATION

General Safety Warnings

Contains critical safety warnings for installation and operation.

Product Warranty and Unauthorized Components

Manufacturer's warranty exclusion for unauthorized parts and their risks.

Electrical Safety Precautions

Warnings about disconnecting power and proper grounding.

Environmental and Fire Hazards

Warnings about connecting ductwork to heat sources and fiberglass insulation.

II. BREAKDOWN PAGE

III. INTRODUCTION

IV. AGENCY PERFORMANCE AUDIT AND EFFICIENCY TESTING NOTICE

Break-in Period

Procedure for running the unit before agency testing.

Efficiency Testing Notice

Guidelines for verifying efficiency ratings.

V. IMPORTANCE OF A QUALITY INSTALLATION

VI. IMPORTANCE OF AIR FLOW AND SETUP

VII. CHECKING PRODUCT AND INSPECTION

VIII. INSTALLATION

A. General Installation Considerations

Pre-installation checkpoints and general considerations.

B. Outside Slab Installation Guidelines

Guidelines for selecting and preparing an outdoor slab location.

C. Installation Clearances

Required minimum clearances for proper operation and servicing.

D. Rooftop Installation Procedures

Considerations for mounting the unit on a roof.

IX. DUCTWORK

X. FILTERS

XI. CONDENSATE DRAIN

XII. CONDENSATE DRAIN, OUTDOOR COIL

XIII. ELECTRICAL WIRING

A. Power Wiring Requirements

Requirements for power supply, disconnects, and wiring.

B. Power Wiring and Electric Heater Kit Instructions

Detailed steps for connecting power and electric heater kits.

C. Control Wiring (Class II)

Guidelines for low-voltage control wiring and thermostat compatibility.

D. Internal Wiring Replacement

Information on internal wiring replacement and adherence to original specifications.

E. Grounding Requirements

Critical warning and requirement for proper unit grounding.

XIV. INDOOR AIR FLOW DATA

XV. PRE-START CHECK

XVI. STARTUP

XVII. OPERATION

XVIII. AUXILIARY HEAT

A. Control System Operation

Explains thermostat control for cooling and heating modes.

XIX. DEMAND DEFROST CONTROL AND HIGH;LOW PRESSURE CONTROLS

Defrost Initiation Conditions

Conditions required to initiate a defrost cycle.

Defrost Termination Methods

How defrost cycles are terminated by time or temperature.

Temperature Sensors Function

Location and function of coil and ambient temperature sensors.

Test Mode for Defrost

Procedure for initiating and monitoring manual defrost cycles.

Troubleshooting Demand Defrost

Steps for diagnosing defrost control issues.

High;Low Pressure Control Monitoring

How pressure controls protect the system and prevent lockouts.

Diagnostic Codes for Defrost Control

Diagnostic codes based on LED indicators and control board status.

Sensor Temperature vs. Resistance Table

Table correlating sensor temperature to resistance values.

XX. GENERAL DATA - RHPB

XXI. ELECTRICAL DATA

XXII. AIRFLOW PERFORMANCE

XXIII. HEATER KIT CHARACTERSTICS

XXIV. WIRING DIAGRAMS

Ruud RHPBZR Series Specifications

General IconGeneral
TypeHeat Pump
RefrigerantR-410A
Cooling Capacity2-5 tons
Heating Capacity2-5 tons
SeriesRHPBZR
Warranty10-Year Limited Warranty

Related product manuals