EasyManua.ls Logo

Saba HD600-BOX-90 - Page 32

Saba HD600-BOX-90
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Mark points on the lines making sure their perfect
horizontal alignment
Mark 3 points (1) on A line, at 80 mm at both sides, including
the central mark on the reference line (you may better use the
bracket 20 to mark easily the points)
Mark 2 points (2) on B line, at 60 mm at both sides of the
vertical reference line�
Mark 2 point (3) on C line, at 60 mm at both sides of the
vertical line�
Fix the brackets:
Drill holes at the marked points with a Φ10 mm drill bit
By measure of precaution, it is recommended to drill the holes at
points (2) on B line only once the lower chimney with bracket 21
is assembled on the hood unit� (refer to Fig�2)�
It allows to verify if the holes of the bracket are precisely on-line
B otherwise mark new points directly from the bracket after
assembly
Insert the Wall Plugs 11 into the holes
Fix the hood xing bracket 20 with 3 screws 10 (5 x 50) at the
horizontal line A
Fix a Chimney xing bracket 21 with 2 screws 10 (5 x 50) at
the horizontal line C
30
GB

Related product manuals