SAHP - BMTB Installation Manual |15
V1 Mar 2019US - SD667052
5.10 The pipe length can be extended up to 50 foot each way.
However for every extra 3 ft of physical separation between
theBMTBandpanel1.6ozsofrefrigerantgasmustbe
added. The minimum pipe length between the thermodynamic
panel and the BMTB is 10 ft.
5.11 A double panel can be installed instead of a single panel.
If a double panel is used an additional 0.22 Ibs of refrigerant
gas is required, this is in addition to any gas added as per 5.10.
5.12 The refrigeration circuit shall be designed with as few bends as
possible, with a maximimum 90
O
bend radiance to minimize
the load loss and it shall be supported properly with a view not
to transmit stresses or vibrations
Fig 5
Suction line (Gas)
Liquid line (Liquid)
Suction line (Gas)
BACK VIEW
BACK VIEW
Ensure that the BMTB IS
connected to the
thermodynamic panel
correctly as shown here,
failure to do so can result
in compressor failure
REFRIGERATION
INSTALLATION continued
SECTION 5