FISHING FOCUSED. FAMILY FRIENDLY.™ | www.SailfishBoats.com
04/24/2019
33
Livewell Operation
Instructions
• Makesuretheseacockbelowthebaitwellpumpis
intheopenposition(seacockisaccessedthrough
thehatchunderthetransomwalkthrudoor).
• Turnonthelivewellswitch.
• Adjusttheblackaeratorinthelivewelltothedesired
ow(ifyourmodelhasalivewellintheleaningpost
youcanadjusttheaeratortopumpwaterintothe
transomlivewellortheleaningpostlivewellorboth)
• Inordertollthelivewell,reachintheaccesshatch
belowthelivewellandclosetheredhandleball
valve.
• ThelivewellwillllupuntilitreachestheOverow
builtintothesideofthelivewell.Thisallowsthe
watertocontinuallypumpinanddrainoutwhile
maintainingthewaterlevel.
• Todrainthelivewellopentheredhandleballvalve.
CLOSED