EasyManua.ls Logo

SAJ CHS2-50K-T6-X User Manual

SAJ CHS2-50K-T6-X
38 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
CHS2 Series
Tel: (86)20 66608588 Fax: (86)20 66608589 Web: www.saj-electric.com
Add: SAJ Innovation Park,No.9, Lizhishan Road,Science City, Guangzhou High-tech Zone , Guangdong, P.R.China
GUANGZHOU SANJING ELECTRIC CO.,LTD
CHS2 Series
C&I ENERGY STORAGE SYSTEM
CHS2-(29.9K-63K)-(T4,T5,T6)-X
(X=204.8V/280Ah/51.5kWh,256.0V/280Ah/64.4kWh,307.2V/280Ah/77.3kWh,358.4V/280Ah/90.2kWh)
V0.0
Question and Answer IconNeed help?

Do you have a question about the SAJ CHS2-50K-T6-X and is the answer not in the manual?

SAJ CHS2-50K-T6-X Specifications

General IconGeneral
TypeHybrid Inverter
Battery TypeLithium-ion
Max. DC Voltage1100V
MPPT Voltage Range200-1000V
Number of MPPTs6
Rated AC Voltage400V
AC Voltage Range310-480V
Rated Grid Frequency50/60Hz
THDi<3%
DC SwitchYes
Protection ClassI
Protection DegreeIP65
ModelCHS2-50K-T6-X
Rated AC Output Power50 kW
Max. AC Output Power55 kW
Max. DC Input Power60 kW
Power Factor Adjustment Range0.8 leading to 0.8 lagging
Overvoltage CategoryIII
Operating Temperature Range-25°C to 60°C
Communication InterfaceRS485, Ethernet

Summary

Preparation

2.1 Safety Instructions

Emphasizes reading all safety instructions and observing local rules for C&I energy storage systems.

2.4 Emergency Situation

Outlines recommended actions for eye, skin, or inhalation exposure to battery electrolyte.

Safety Precautions

1.2 Safety Instructions

Details safety warnings for operating the inverter, including dangers and cautions.

Product Information

3.5 Datasheet Inverter

Presents detailed electrical and technical specifications for different CHS2 inverter models.

Installation Instructions

4.2 Installation Method and Position

Specifies recommended installation locations and clearance requirements for optimal performance.

4.3 Mounting Procedure

Outlines the steps for mounting the inverter, including tools and procedures.

Electrical Connection

5.1 Additional Grounding Cable

Details the procedure for connecting an additional grounding cable for safety.

5.3.1 Export Limit Setting

Guides on setting export limits to control power fed back to the grid.

5.3.5 Emergency Stop Dry Contact

Describes the connection for the emergency stop function using dry contacts.

5.4 Connecting the AC Cable

Specifies recommended cable sizes and connection procedures for AC cables.

5.5 PV Side Connection

Guides on connecting the photovoltaic array to the inverter, including safety warnings.

5.5.1 PV Connector Assembly

Provides instructions for assembling PV connectors and connecting DC cables.

Commissioning

6.1 Start Up and Shut Down

Details the step-by-step procedures for starting up and shutting down the energy storage system.

6.8 Export Limit Setting

Details methods for controlling the amount of electricity exported to the grid.

Maintenance

Troubleshooting and Warranty

Troubleshooting

Lists various fault codes and their corresponding fault information for diagnosis.

Related product manuals