HYBRID SOLAR INVERTER INSTRUCTION MANUAL
3837
5.6
Self-test
(For Italy)
Connect a communication module (Wi-Fi/ 4G/
Ethernet) with inveer (connection procedure
can refer to eSolar Module Quick Installation
Manual)
Step 1:
Select Italy for Count and choose your
corresponding Grid Code from Initial Setting.
Step 2:
Italian Standard CEI0-21 requires a self-test function for all inveer that connected to utility
grid. During the self-testing time, inveer will check the reaction time for over frequency,
under frequency, oveoltage and undeoltage. This self-test is to ensure the inveer is able
to disconnect from grid when required. If the self-test fails, the inveer will not able to feed
into the grid.
The steps of running Self-test are as followed:
You can choose self-test item required. Individual self-test time is approx. 5 minutes. All self-test
time is approx. 40 minutes. After the self-test is completed, you can save the test repo. If self-test
is failed, please contact with SAJ or your inveer supplier.
Step 3: Sta Self-test

Other manuals for SAJ H2-5K-T2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the SAJ H2-5K-T2 and is the answer not in the manual?

SAJ H2-5K-T2 Specifications

General IconGeneral
BrandSAJ
ModelH2-5K-T2
CategoryInverter
LanguageEnglish

Related product manuals