Indoor Unit Installation
English
Installation
Step 2-5 Optional: Extending the power
cable
1 Prepare the following tools.
Tools Spec Shape
Crimping pliers MH-14
Connection sleeve
(mm)
20xØ6.5 (HxOD)
Insulation tape Width 19 mm
Contraction tube
(mm)
70xØ8.0 (LxOD)
2 As shown in the figure, peel off the shields from the
rubber and wire of the power cable.
Peel off 20 mm of cable shields from the pre-
installed tube.
CAUTION
For information about the power cable specifications
for indoor and outdoor units, refer to the installation
manual.
After peeling off cable wires from the pre-installed
tube, insert a contraction tube.
If cable wires are connected without using connecting
sleeves, their contact area becomes reduced, or
corrosion develops on the outer surfaces of the wires
(copper wires) over a long time. This may cause an
increase of resistance (reduction of passing current)
and consequently may result in a fire.
Power cable
20
60
20 20 20
Pre-installed
tube for the
power cable
20 20
60
120
120
180
180
(Unit: mm)
3 Insert both sides of core wire of the power cable into the
connection sleeve.
Method 1: Push the core wire into the sleeve from
both sides.
Method 2: Twist the wire cores together and push it
into the sleeve.
Method 1
Connection sleeve Connection sleeve
Method 2
4 Using a crimping tool, compress the two points and flip
it over and compress another two points in the same
location.
The compression dimension should be 8.0.
Compression
dimension
After compressing it, pull both sides of the wire to
make sure it is firmly pressed.
Method 1 Method 2
Compress it 4 times
5 mm 5 mm
Compress it 4 times
5 Wrap it with the insulation tape twice or more and
position your contraction tube in the middle of the
insulation tape.
Method 1 Method 2
Insulation tape
40 mm 35 mm
Insulation tape
DB68-08947A-00_IM_CAC QMD_EU_EN_.indd 12 2020-02-10 오전 11:14:29