EasyManua.ls Logo

Samsung AM DNCDKG Series - Wiring Work; Power and Communication Cable Connection

Samsung AM DNCDKG Series
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
40
English
Troubleshooting
Installation manual
Power and communication cable connection
1 Before wiring work, you must turn off all power source.
2 Indoor unit power should be supplied through the breaker( ELCB or MCCB+ELB ) separated by the outdoor power.
ELCB : Earth Leakage Circuit Breaker
MCCB : Molded Case Circuit Breaker
ELB : Earth Leakage Breaker
3 The power cable should be used only copper wires.
4 Connect the power cable{1(L), 2(N)} among the units within maximum length and communication cable(F1, F2) each.
5 Connect F3, F4(for communication) when installing the wired remote control.
N L
N L N L N L
V1 V2
Indoor Unit 1
Indoor Unit 2
Indoor Unit 3
Indoor Unit 4 Indoor Unit 5
Indoor Unit 6
Outdoor Unit
Wired Remote
Control
EEV kit
Ceiling, wall-mounted indoor unit.
220-240V~
or
ELCB : Essential Installation
MCCB+
ELB
ELCB
WARNING
Power off before connecting any wires; Indoor PBA will be damaged while V1,V2,F3,F4 short each other.
Power and communication cable connection
Wiring work

Related product manuals