23Samsung Electronics
Heat
Exchanger
(Evaporator)
Gas side
3-Way valve
3-Way valve
Liquid side
Cooling
Gas leak check point
Heat
Exchanger
(Condenser)
Heating
Capillary tube
Check valve
Compressor
4-Way valve
Capillary tube
■ Refrigerating cycle temperature and pressure
• Amount of refilling per extension length of 1m;
• When extending the pipe length by more than 5m, 40g of R22 refrigerant should be refilled per extension length of 1m.
Allowable pipe length : Maximum 15m
Allowable pipe drop distance : Maximum 10m
Operating Condition
STD Pressure
(kg/cm
2
G)
(GAS SIDE)
Piping Temp. Use Temp. Condition (°C)
T1
T2
Indoor Outdoor
DB
4.5~5.5
6.5~7.5
3~4
18.5~20.5
-
-
40~45
50~55
30~35
32~36
36~40
28~32
9~12
14~18
1~4
65~75
70~80
40~45
27
32
21
20
27
20
19
23
16
-
-
-
35
43
21
7
21
2
24
26
16
6
16
1
Cooling
Heating
Standard
Max over load
Low temp.
Standard
Max over load
Deice
WB WBDB
INDOOR UNIT OUTDOOR UNIT
4. Refrigerating Block Diagram