107
12-5 Installation
12-5-1 Before Installation
Keep the air conditioner outlet and inlet free from its surroundings.In case of installation, keep
thesymmetryandxittopreventvibration.Thepipelengthshallmeetthestandardasfaras
possible.
12-5-2 Installation Procedure
■ Location
Install the product in an area to guarantee the best cooling eect, convenience of piping and elec
-
tric work, and inexistence of vibration or wind.
■ Wall Drilling
Drill the wall downward in a diameter of 60 to 65mm.
■ Fixing Indoor Unit & Outdoor Unit
Fix the air conditioner indoor unit securely to the wall. Secure the outdoor unit in a suitable
position.
■ Pipe Spooling & Connectingt
You shall cut the pipe with a pipe cutter and grind all the burrs of the cut surface. pipe expan-
sion may continue until the pipe surface becomes uneven or torn apart. Be sure to use a torque
wrench to tighten pipes or are nuts.
■ Leak Test
Put an inset gas like nitrogen in the outdoor unit pipe and put soap bubbles or other test liquids
on the pipe surface for the leak test.
■ Drain Hose Connecting
Install the drain hose downward to drain water naturally. Be sure to pour water into the hose to
check if it drains well.
■ Electric & Earth Work
Electric and earth work shall meet the “Electric Facility Technology Standard” and the “Internal
Wire Regulation” of the Electric Business Laws.
■ Inspection & Trial Run
Upon completion of the tests, you shall make a trial run while you explain the main functions of
theairconditionertonishtheinstallation.