2
English
Contents
Safety Information 3
Safety Information 3
Installation 7
Preparation 7
Step 1-1 Viewing the typical installation 7
Step 1-2 Choosing the installation location 8
Step 1-3 Unpacking 11
Step 1-4 Preparing materials and tools 12
Indoor Unit Installation 14
Step 2-1 Attaching the mounting bracket to the wall 14
Step 2-2 Drilling the wall penetration 14
Step 2-3 Connecting the refrigerant pipes 15
Step 2-4 Connecting the power and communication cables 16
Step 2-5 Optional: Extending the power cable 17
Step 2-6 Connecting the drain hose 19
Step 2-7 Taping the pipes, cables, and drain hose 20
Outdoor Unit Installation 21
Step 3-1 Mounting the outdoor unit 21
Step 3-2 Connecting the cables and the pipes 22
Installation Inspection and Testing 24
Step 4-1 Performing a drain leak test 24
Step 4-2 Performing the gas leak tests 24
Step 4-3 Evacuating the system 25
Step 4-4 Adding refrigerant (if needed) 26
Step 4-5 Important information: regulation regarding the refrigerant used 26
Step 4-6 Preparing the system for commissioning 27
Step 4-7 Commissioning the unit 27
Step 4-8 Performing final checks and trial operation 28
Maintenance Procedures 30
Sub PCB installation(optional) 31
Safety Information
For information on Samsung’s environmental commitments and product-specific regulatory obligations, e.g.
REACH, WEEE, Batteries, visit : samsung.com/uk/aboutsamsung/samsungelectronics/corporatecitizenship/
data_corner.html