EasyManua.ls Logo

Samsung SH09YAB - Outdoor Unit Installation; Wiring Connection; Installation of Drain Line

Samsung SH09YAB
66 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3-8 Samsung Electronics
Operating Instructions and Installation
3-2-2(e) Outdoor unit installation
1. Remove the cover-E parts.
2. Firmly connect the cable connector in the terminal block.
3. Fasten the M4 ring terminal to the hole marked
4. Firmly fix the ass'y cable with clamp wire holder.
5. Assemble the cover-E parts.
6. To prevent the entry of water, form a trap of the ass'y cable as illustrated in the installation dia-
gram of indoor and outdoor unit.
In heating and de-ice operation, condensed water may be generated.
Install drain line as following procedure.
1. Close Hole with Cap Drain A.
2. Close Hole with Cap Drain B.
3. Insert Drain plug into Hole , and then connect drain hose to drain plug.
Inside diameter of drain hose is 18mm.
Wiring connection
Installation of drain line
A B C D
N1 1 2 3
Cover-E parts
Screw
Hole
C
B
A
A
Hole
C
Hole
B
Drain Plug
Cap-Drain A
Cap-Drain B
Assy cover valve (RO Hand cabi, RH)
Drain hole
(
✳✳
YABX)

Table of Contents

Other manuals for Samsung SH09YAB

Related product manuals