EasyManua.ls Logo

Sanyo MCO-19M - Control Panel and Keypad Operations; Understanding the Control Panel Interface

Sanyo MCO-19M
78 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11
23. Connecting port A/B for N
2
/O
2
gas pipe: Refer to page 17 for gas cylinder connection. Ensure that
the gas pressure is set at 0.05 MPaG (0.5 kgf/cm
2
G, 7.1 psiG). Refer to page 30 for automatic N
2
(or O
2
)
gas cylinder changeover.
24. Attachment location for electric key: This is the attachment location for the electric key included in
the optional Component H
2
O
2
Decontamination Kit (MCO-HL). This kit must be attached to perform H
2
O
2
decontamination. Refer to the installation procedure for MCO-HL for details.
25. Gas injection nozzle
* MCO-19M(UVH)/19M(UV) or when an optional UV System Kit (MCO-19UVS) is installed.*
Get other manuals https://www.bkmanuals.com

Table of Contents

Other manuals for Sanyo MCO-19M

Related product manuals