EasyManua.ls Logo

Sartorius MSE224S - Transporting the Parts (Large Analytical Draft Shield)

Sartorius MSE224S
121 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Care and Maintenance
Cubis MSE Operating Instructions 81
Transporting the Parts (Large Analytical Draft Shield)
t Get the box for the individual parts of the balance ready�
t Place the bottom foam piece in the box�
t Place the panels in the packaging:
1) Place the upper draft shield panel into the packaging (handle upwards)�
2) Place the side draft shield panel into the packaging (handle upwards)�
3) Place the other side panel into the packaging (handle downwards)�
t Then place the top foam piece in the box�
1
2
3

Related product manuals