1. Condensate is produced when the condensing boiler is running and should be
piped to the drainage system.
2. Link the drain hose with the outlet of the neutralization system which is located at
the bottom of boiler and then connect the end of the hose to a soak pit.
3. Please make sure that the neutralizer in the boiler is filled with water.
4. The condensate drain system should be installed to minimise the risk of freezing.
Ensure the condensate is sent
to a suitable waste outlet in
accordance with regulations.