Sequence of Operation
• Inlet water solenoid valve opens to fill the
reservoir
• Hot gas valve opens to equalize the system
• Compressor, fan and pump start
• Hot gas valve closes, freeze cycle begins
• Freeze cycle continues until evaporator
temperature reaches a preset point - 0, which
triggers a 10 minute (default) timer
• In 10 minutes the Harvest cycle begins