EasyManua.ls Logo

Scotsman CU50 - Start Up

Scotsman CU50
57 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Sequence of Operation - Harvest
• Hot gas valve opens
• Pump and Fan motor stop
• Inlet water valve opens and refills the reservoir
– Fill time varies with evaporator temperature
• Timed during a power restart or in clean cycle
• Harvest continues
– When the evaporator temperature warms to a preset
point – 50, a 20 second (default) timer starts
– When the time expires, harvest ends