EasyManua.ls Logo

SCS Sentinel Open3 - Page 80

SCS Sentinel Open3
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EN ::: 38
EN
Before carrying out any maintenance work, disconnect the automation system from the power supply.
Do not clean the product with solvents or abrasive or corrosive substances. Maintenance should be carried out every 6 months:
• Clean the zone around the motor.
Ensure proper maintenance of your product and safety devices. Frequently check the installation for any sign of imbalance, wear
or damage to cables and the assembly. Do not use the apparatus if repairs or adjustments are needed. Call in quali ed personnel.
This symbol means that the equipment is subject to selective waste collection. Do not throw the packaging out with your household
waste. The hazardous substances it may contain can endanger health and the environment. Use the selective waste collection
means put at your disposal by your local council or distributor.
« SCS Sentinel hereby declares that this article is in conformity with the RTTE directive 1999/5/CE. »
++++
If you want to order spare parts and/or accessories, go to:
scs-laboutique.com

Related product manuals