EasyManua.ls Logo

Seakeeper 9 - System Arrangement and Installation; Cooling System Requirements

Seakeeper 9
35 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OPERATION
MANUAL
Product:
Document #:
Rev:
Page:
SEAKEEPER 9 / 7HD
90223
6
2 of 3
Arrangement
The Seakeeper 9 consists of the Flywheel, Enclosure, Foundation, Electronics, Brake, Cooling,
and Cover Subsystems.
Installation Location
The Seakeeper is a torque device and does not have to be installed in a specific hull location or
on the centerline. However, the Seakeeper should not be installed forward of the longitudinal
center of gravity in a planing vessel.
Mounting Dimensions
See Seakeeper Drawing 90225 for bolt-in installation details.
See Seakeeper Drawing 90226 for bond-in installation details.
Loads
The installer is responsible for designing the foundation to which the Seakeeper is attached and
for ensuring that this foundation can safely transfer the concentrated Seakeeper loads from the
frame to the adjacent hull structure. Loads that the Seakeeper imposes on the hull structure are
explained on Seakeeper Drawings 90225 and 90226; these loads do NOT include vessel
motion accelerations, such as vertical slam loads which can be high for higher speed vessels.
Cooling
The Seakeeper bearings, Motor Drive Box, and hydraulic manifold are cooled by a closed water
/ glycol mix cooling loop that incorporates a sea water heat exchanger. The installer is
responsible for providing 15 30 lpm (4 8 gpm) raw water at ambient sea temperature and 1.4
Bar (20 psi) maximum pressure to the heat exchanger.

Other manuals for Seakeeper 9

Related product manuals