EasyManua.ls Logo

Sealey DG5000 - 6.3. Running-In Periods of Operation; 6.4. Battery; 7. Check List Whilst Running; 8. Operating Procedure 230 V

Sealey DG5000
8 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
WARNING! 
6.3. 
6.3.1. The rst 20 hours are the break-in period of the engine. For this reason, it is important to follow the following instructions during this
period.
6.3.2. Warm up the engine 5 minutes after the initial starting, before applying load.
6.3.3. Avoid applying loads above 3kw during the rst 20 hours of operation.
6.3.4. It is important to replace the engine oil on time.
6.3.5. 
6.3.6. Ensure that old engine oil is drained out completely.
6.4. 
6.4.1. Do not connect tools or any other appliances to the generator before starting.
6.4.2. Explosive gases are given o󰀨 when charging battery. Only charge in a well-ventilated area, away from sparks and naked ames.
6.4.3. When you rst install the battery, ensure that the battery’s polarity is the same as the generator’s battery leads. - Black = negative,
+ Red = positive.
6.4.4. Using a voltmeter - check the voltage is 12.3V+, if lower, the battery must be charged before use.
6.4.5. Check that the voltage is correct every use and every month. The battery should be between 12.5v and 13.6v. When the engine is
running it should re-charge the battery.
6.4.6. Make sure battery is free from damage and is not leaking. If battery shows signs of damage or leaking – DO NOT continue to use.
Instead replace battery immediately.
6.4.7. Make sure that all battery acid spills are correctly cleaned up straight away.
6.4.8. The battery should be stored in a charged condition.
6.4.9. The battery is a 12V 36Ah sealed lead acid battery and requires no maintenance other than; ensuring battery terminal’s are
kept clean, kept tight and covered to prevent short circuiting.
6.4.10. Keep the battery in a cool, dry place. It is important to clean the battery every three months and charge every six months.
 
7.4.1. During each use make sure that there are no abnormal sounds or vibration.
7.4.2. Check that the engine is running smoothly normally.
7.4.3. Check that there is no excessive smoke from the exhaust after ten minutes of running, and the engine has reached working
temperature.
7.4.4. Check that there are no oil or fuel leaks.
7.4.5. If you notice any of the above, stop the engine and locate the fault. Please contact your Sealey Stockist.
8. 
8.1. Follow starting procedure (6.1) then switch ON the main breaker switch, and with the engine running check the voltage reading when
in ‘Voltage Mode’. It should read 230v ± 5% (50Hz) (g.9).
8.2. The Digital panel only becomes active when the Main breaker is in the ‘ON’ position. The following will be displayed by successive
presses of the ‘M’ or mode button.
Voltage mode Frequency mode
Event timer Mode Total run mode

© Jack Sealey Limited
Original Language Version
DG5000 Issue:1 28/02/23
Fuel injection limiting
bolt

Lamp
Illuminated
Indicating
V Voltage
Hz Frequency
V1 Event timer- or current running time (hours) This will reset to
zero when main breaker is ‘OFF’
V2 Total run time

Related product manuals