EasyManua.ls Logo

Seca 240 - Before You Start and Assembly; Unpacking and Scope of Supply; Assembly Instructions - Initial Steps

Seca 240
5 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Model 240 9
GB
3. Before you start
Unpacking
Remove the packaging.
The scope of supply includes:
measuring rod, bottom part
measuring rod, top part, with head stop
heel plate
5 mounting screws
5 rawlplugs
20 spacers
2 cylindrical bolts (plastic) and nuts
1 bag containing a pan-head tapping
screw
1 set of operating instructions
Assembly
Select a location for attaching the measuring rod where the floor is level and unyielding.
In order to avoid damage to the measuring rod during use, the heel plate must be
supported against the wall. The number of spacers used determines the distance
of the measuring rod from the wall. You need to use at least one spacer for each
of the two mounting points.
Place the spacers on top of one another
and screw them to the heel plate using
the plastic nuts and bolts.
Alternatively..

Related product manuals