8
3. Before you start…
Unpacking
– Remove the packaging.
The scope of supply includes:
• weighing platform,
•column with displa
• 2 mounting screws.
Fitting the column
On the seca 786 cultura, the column is already fitted. On the other models, please
proceed as follows:
– turn the column so that the display faces
the weighing surface.
– pass the connecting rod through the
opening and place the column in the
opening.
– Screw the column to the weighing
platform from underneath.
– If necessary, lay the scale carefully on its
side to tighten up the screws.
– Hook the connecting rod over the load
lever tongue.
– Then place the scale upright again.
load lever-
connecting rod
tongue