EasyManua.ls Logo

SEM 250 - Cabinet Installation and Setup

SEM 250
14 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
508.366.1488 | www.semshred.com
6
Cabinet Installation and Setup
A.
Place cabinet in location
approximately 2-3 inches from
wall and within six feet of
dedicated 20-amp receptacle.
B.
Place Model 250 on top cover with front of unit door
and the four base holes aligned with the cabinet top holes.
C.
Using the supplied bolts, place a bolt and
flat washer in each of the four holes
from the top and secure tightly with
additional washer and locknut from
below using a ½” wrench and ½” socket.
D.
Place vacuum upright inside rear of
cabinet and feed hose up through large
center hole. Attach hose to rear of
collection transition.
E.
Feed vacuum power cord down
through remaining hole and connect to
vacuum plug.

Related product manuals