-2-
2.Installation
2.1 Installation sites
Following location shall be recommendable for installations ;
Well ventilated①
Ambient temperature shoud be from -5 to 40 .℃℃
Cool and no-heated②
A location where is not exposed to direct sunshine, to high radiant heat.
Less humid③
: Do not install P E-8E at the places of high humidity or under the conditions that
the water and chemicals may splash on. These may be causes of the damages to
insulation or of rust.
Ambient humidity shoud be lower than 85 % RH.
Less mechanical vibrations④
Maintenance and inspection works are easy⑤
Others;⑥
Do not install PE-8E at the place that any corrosive gases or dusts store.
Avoid the places where is much influenced to the electromagnetic field.
2.2 Installation way
When you change the measuring subject pH/ORP , transmission output()
ranges, and the control actuations of ALM 1, ALM 2, re-set the internal
switches first before fixing into the control panel.
Mounting way of the meter is for the panel- mount type.①
Prepare the panel cut as under mentioned.
For the application of multiple-lined panel, clearances to the neighbor panel cuts shoud be
kept horizontally 25mm or over, vertically 35mm or over.
Recommendable thickness of the panel shall be 1~5mm.
Insert the meter body head-on into the panel.②
: Do not fasten screws too tight.
Put the Mounting Fitting into two fitting holes up-and-down at meter body case, then fasten③
the screws clockwise with a (+) screwdriver.
▼
▲
pH
MEAS
CAL
ENT
CAL
SEL
DISP
ALM
1122
JAPAN
S
ENSONI
X
PE‑8E
MEAS
118
130
92
+0.8
0
92
+0.8
0
□96
10
91.5
111.5
145
p
a
n
e
l
c
u
t
o
u
t
(
m
i
n
i
)
(
m
i
n
i
)