Drive Technology \ Drive Automation \ System Integration \ Services
Explosion-Proof
Gear Units R..7, F..7, K..7, S..7 Series,
Spiroplan® W
Operating Instructions
Edition 05/2008
11630213 / EN

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the SEW-Eurodrive FA97 and is the answer not in the manual?

Summary

Safety Notes

General information

General safety warnings regarding operation and installation.

Checklists

Before startup

Checklist for activities before startup in potentially explosive atmospheres.

During startup

Checklist for activities during startup in potentially explosive atmospheres.

Gear Unit Design

Nameplate;unit designation

Explanation of nameplate information and special ATEX indications.

Mechanical Installation

Prerequisites for assembly

Conditions to be met before starting assembly for standard and special versions.

Installing the gear unit

Guidelines for installing gear units, including support structure and screw quality.

Gear units with solid shaft

Specific installation notes for gear units with solid shafts.

Shaft-mounted gear units with shrink disk

Installation notes for shaft-mounted gear units utilizing shrink disks.

Shaft-mounted gear unit with TorqLOC

Installation procedures for gear units featuring the TorqLOC® system.

Adapter with a torque limiting coupling AR

Information on installing adapters with torque limiting couplings.

Startup

Checking the oil level

Procedure for checking the oil level before initial startup.

Measuring surface and oil temperature

Guidelines for measuring surface and oil temperatures during startup.

Speed monitoring

Information on installing and adjusting speed monitoring systems.

Installation of the voltage encoder

Procedure for installing and setting the voltage encoder.

Inspection;Maintenance

Preliminary work regarding gear unit inspection;maintenance

Safety and preparatory notes before performing inspection/maintenance.

Inspection;maintenance intervals

Table of inspection/maintenance tasks based on time intervals.

Lubricant change intervals

Graph showing lubricant change intervals based on temperature and hours.

Adapter AR

Maintenance intervals and tasks for AR adapters, including friction lining.

Inspection;maintenance for the gear unit

General information on gear unit inspection and maintenance.

Mounting Positions

Designation of the mounting positions

Illustrates the six mounting positions (M1-M6) for gear units.

Technical Data

Malfunctions;Service

Summary

Safety Notes

General information

General safety warnings regarding operation and installation.

Checklists

Before startup

Checklist for activities before startup in potentially explosive atmospheres.

During startup

Checklist for activities during startup in potentially explosive atmospheres.

Gear Unit Design

Nameplate;unit designation

Explanation of nameplate information and special ATEX indications.

Mechanical Installation

Prerequisites for assembly

Conditions to be met before starting assembly for standard and special versions.

Installing the gear unit

Guidelines for installing gear units, including support structure and screw quality.

Gear units with solid shaft

Specific installation notes for gear units with solid shafts.

Shaft-mounted gear units with shrink disk

Installation notes for shaft-mounted gear units utilizing shrink disks.

Shaft-mounted gear unit with TorqLOC

Installation procedures for gear units featuring the TorqLOC® system.

Adapter with a torque limiting coupling AR

Information on installing adapters with torque limiting couplings.

Startup

Checking the oil level

Procedure for checking the oil level before initial startup.

Measuring surface and oil temperature

Guidelines for measuring surface and oil temperatures during startup.

Speed monitoring

Information on installing and adjusting speed monitoring systems.

Installation of the voltage encoder

Procedure for installing and setting the voltage encoder.

Inspection;Maintenance

Preliminary work regarding gear unit inspection;maintenance

Safety and preparatory notes before performing inspection/maintenance.

Inspection;maintenance intervals

Table of inspection/maintenance tasks based on time intervals.

Lubricant change intervals

Graph showing lubricant change intervals based on temperature and hours.

Adapter AR

Maintenance intervals and tasks for AR adapters, including friction lining.

Inspection;maintenance for the gear unit

General information on gear unit inspection and maintenance.

Mounting Positions

Designation of the mounting positions

Illustrates the six mounting positions (M1-M6) for gear units.

Technical Data

Malfunctions;Service

SEW-Eurodrive FA97 Specifications

General IconGeneral
BrandSEW-Eurodrive
ModelFA97
CategoryEngine
LanguageEnglish