EasyManua.ls Logo

SEW-Eurodrive SA87 User Manual

SEW-Eurodrive SA87
160 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Drive Technology \ Drive Automation \ System Integration \ Services
Explosion-Proof
Gear Units R..7, F..7, K..7, S..7 Series,
Spiroplan® W
Operating Instructions
Edition 05/2008
11630213 / EN

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the SEW-Eurodrive SA87 and is the answer not in the manual?

SEW-Eurodrive SA87 Specifications

General IconGeneral
BrandSEW-Eurodrive
ModelSA87
CategoryEngine
LanguageEnglish

Summary

Safety Notes

General Information

General safety warnings and precautions.

Startup/operation

Key checks before and during startup.

Checklists

Before Startup

Checklist for pre-startup activities in explosive atmospheres.

During Startup

Checklist for startup activities in explosive atmospheres.

Gear Unit Design

Nameplate/Unit Designation

Explains nameplate information and unit coding.

Nameplate

Detailed explanation of nameplate fields.

Mechanical Installation

Prerequisites for Assembly

Conditions to check before starting assembly.

Installing the Gear Unit

Procedures for physically installing gear units.

Gear Units and Gearmotors in Category II2GD

Specific installation for explosion-proof categories.

Shaft-Mounted Gear Unit with Keyway or Splined Hollow Shaft

Installation for shaft-mounted units with keyways/splines.

Shaft-Mounted Gear Units with Shrink Disk

Installation procedure for shrink disk mountings.

Shaft-Mounted Gear Unit with TorqLOC®

Installation procedure for TorqLOC® shaft mounting.

Startup

Checking the Oil Level

Procedures for checking oil levels before startup.

Measuring Surface and Oil Temperature

Methods for measuring operating temperatures.

Gear Units with Backstop

Startup procedures for units with backstops.

Inspection/Maintenance

Preliminary Work Regarding Gear Unit Inspection/Maintenance

Safety and preparation for maintenance tasks.

Inspection/Maintenance Intervals

Recommended intervals and tasks for maintenance.

Lubricant Change Intervals

Guidelines for changing lubricants based on conditions.

Inspection/Maintenance for the Gear Unit

General gear unit inspection and oil checks.

Mounting Positions

Designation of the Mounting Positions

Defines and illustrates the 6 standard mounting positions.

Helical Gearmotors R

Mounting positions for helical gearmotors R series.

Helical Gearmotors RX

Mounting positions for helical gearmotors RX series.

Malfunctions/Service

Gear Unit

Troubleshooting common gear unit problems.

Related product manuals