EasyManua.ls Logo

Sharp DV-NC70 - Page 33

Sharp DV-NC70
99 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
33
DV-NC70/W
DV-NC70X/RU
Figure 8-38.
8-24. INSTALLING THE SIFTER
Figure 8-37.
1. Make sure that the loading arm T and S are at the Phase-
Matching point as shown below .
2. Fix the sifter position setting part to the roading arm T
position setting part as shown in figure .
3. Make sure tension arm not run on the sifter as shown in
figure .
c
Loading arm (T)
Sifter
Insert point
Loading arm (T)
Loading arm (S)
Phase matching
*Not run on the
sifter.
Sifter
Tension arm
a
c
b
Drum
Capstan D.D.
motor
(Bottom side of mechanism chassis)
a
b

Related product manuals