EasyManua.ls Logo

Sharp R-306LK

Sharp R-306LK
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CONTENTS
PRECAUTIONS TO BE OBSERVED BEFORE AND
DURING SERVICING TO AVOID POSSIBLE EXPO-
SURE TO EXCESSIVE MICROWAVE ENERGY
CHAPTER 1. WARNING TO SERVICE PERSONNEL
[1] Before Servicing .........................................1-1
[2] When the testing is completed, ..................1-1
[3] After repairing .............................................1-1
CHAPTER 2. MICROWAVE MEASUREMENT PRO-
CEDURE
[1] Requirements: ............................................2-1
[2] Preparation for testing: ...............................2-1
[3] Leakage test: ..............................................2-1
CHAPTER 3. FOREWORD AND WARNING
[1] FOREWORD ..............................................3-1
[2] WARNING ..................................................3-1
[3] DANGER ....................................................3-1
CHAPTER 4. PRODUCT DESCRIPTION
[1] SPECIFICATIONS......................................4-1
CHAPTER 5. GENERAL INFORMATION
[1] GROUNDING INSTRUCTIONS .................5-1
[2] OVEN DIAGRAM........................................5-1
CHAPTER 6. OPERATION
[1] DESCRIPTION OF OPERATING SE-
QUENCE ...................................................6-1
[2] OVEN SCHEMATIC ...................................6-2
[3] DESCRIPTION AND FUNCTION OF
COMPONENTS..........................................6-3
CHAPTER 7. TROUBLESHOOTING GUIDE
[1] TROUBLESHOOTING CHART .................7-1
CHAPTER 8. TEST PROCEDURES
[1] Procedure A: MAGNETRON ASSEMBLY
TEST ..........................................................8-1
[2] Procedure B: POWER TRANSFORMER
TEST ..........................................................8-1
[3] Procedure C: HIGH VOLTAGE RECTIFI-
ER TEST ....................................................8-1
[4] Procedure D: HIGH VOLTAGE CAPACI-
TOR TEST..................................................8-2
[5] Procedure E: TEMPERATURE FUSE OR
THERMAL CUT-OUT TEST .......................8-2
[6] Procedure F: SECONDARY INTERLOCK
SWITCH TEST ...........................................8-2
[7] Procedure F: PRIMARY INTERLOCK
SYSTEM TEST...........................................8-2
[8] Procedure G: MONITOR SWITCH TEST.....8-3
[9] Procedure H: BLOWN MONITOR FUSE
TEST ..........................................................8-3
[10] Procedure I: NOISE FILTER TEST.............8-4
[11] Procedure J: TOUCH CONTROL PANEL
ASSEMBLY TEST ......................................8-4
[12] Procedure K: KEY UNIT TEST ................... 8-5
[13] Procedure L: RELAY TEST......................... 8-6
[14] Procedure M: DEFROST TEST .................. 8-6
[15] Procedure N: FOIL PATTERN ON THE
PRINTED WIRING BOARD TEST.............. 8-6
CHAPTER 9. TOUCH CONTROL PANEL ASSEM-
BLY
[1] OUTLINE OF TOUCH CONTROL PANEL ..... 9-1
[2] DESCRIPTION OF LSI ............................... 9-1
[3] SERVICING FOR TOUCH CONTROL
PANEL ........................................................ 9-3
CHAPTER 10. PRECAUTIONS FOR USING LEAD-
FREE SOLDER
[1] Employing lead-free solder ....................... 10-1
[2] Using lead-free wire solder ....................... 10-1
[3] Soldering................................................... 10-1
CHAPTER 11. COMPONENT REPLACEMENT AND
ADJUSTMENT PROCEDURE
[1] WARNINGS ...............................................11-1
[2] OUTER CASE REMOVAL .........................11-2
[3] POWER TRANSFORMER REMOVAL ......11-2
[4] HIGH VOLTAGE COMPONENTS RE-
MOVAL(HIGH VOLTAGE CAPACITOR
AND HIGH VOLTAGE RECTIFIER AS-
SEMBLY) ...................................................11-2
[5] MAGNETRON REMOVAL .........................11-2
[6] POSITIVE LOCK CONNECTOR (NO-
CASE TYPE) REMOVAL ...........................11-3
[7] CONTROL PANEL ASSEMBLY REMOV-
AL ..........................................................
....11-3
[8] GRAPHIC SHEET AND MEMBRANE
SWITCH REPLACEMENT.........................11-3
[9] TURNTABLE MOTOR REMOVAL .............11-4
[10] COOLING FAN MOTOR REMOVAL..........11-4
[11] POWER SUPPLY CORD REPLACE-
MENT.........................................................11-5
[12] DOOR SENSING SWITCH/SECONDARY
INTERLOCK SWITCH AND MONITOR
SWITCH REMOVAL ..................................11-5
[13] DOOR SENSING SWITCH/SECONDARY
INTERLOCK SWITCH AND MONITOR
SWITCH ADJUSTMENT ...........................11-5
[14] DOOR REPLACEMENT ............................11-6
CHAPTER 12. CIRCUIT DIAGRAMS
[1] Pictorial Diagram (Figure S-1) .................. 12-1
[2] Control Panel Circuit (Figure S-2)............. 12-2
[3] Printed Wiring Board (Figure S-3) ............ 12-3
Parts List

Table of Contents

Related product manuals