EasyManua.ls Logo

Shift Power Full Race Unit - Power and Sensor Installation; Connect Ground Wire; Install SP-Shift Sensor

Default Icon
7 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
The pictures are for illustrative purposes and from YZF-R1(2007-2008) model.
The Full Race Unit will require negative (ground) connection to power up, connect the
single black wire to the battery NEGATIVE (-) lead!
Remove your original shift rod and install SP-Shift Sensor with the fitting rod(s) provided
to its place. Route the wire to the Full Race Unit control box and plug it in. When installing the
sensor, make sure all counter nuts are locked and the sensor wire is not under tension when

Related product manuals