USER’S MANUAL
CLEAN WATER PUMP
Models:SQm,QB,WZB,AWZB,DK,SHF(m),SGA(m)
CP(m),2SGP(m),SGT,JET,AUTOJET,SGJS,SGJW
SHIMGE PUMP INDUSTRY GROUP CO., LTD.

Other manuals for SHIMGE SQm

Question and Answer IconNeed help?

Do you have a question about the SHIMGE SQm and is the answer not in the manual?

SHIMGE SQm Specifications

General IconGeneral
ModelSQm
Power0.37-2.2kW
Frequency50Hz
MaterialStainless Steel
Minimum well diameter100 mm
Voltage220/380 V
Phase1/3

Summary

Safety Warnings

Product Overview

Conditions for Use

Troubleshooting

Installation and Application Notices

Pre-Installation Checks

Check pump components for damage and insulation resistance before installation.

Pump and Pipe Installation

Fix pump, connect pipes, ensure strainer/foot valve placement for self-priming.

Rotation Direction Check

Check pump rotation direction with screwdriver and swap phases if incorrect.

Intake Pipe Sealing

Ensure intake pipe and joints are completely sealed to prevent air leakage.

Maintenance

Insulation Resistance Check

Regularly check insulation resistance (min 50MΩ) and take measures if below requirement.

Dismantlement and Inspection

Disassemble pump, check bearings, seal, impeller, foot valve, and replace damaged parts.

Air Tightness Testing

Conduct hydraulic/pneumatic pressure test for 5 mins to check for leaks after assembly.

Frost Protection

Drain residual water to prevent pump body cracking from frost when ambient temp is low.

Long-Term Storage

Disassemble, drain, rinse, and store pump in a dry, ventilated place for long-term storage.

Installation and Maintenance Illustrations

Installation Environment

Install pumps in dry, well-ventilated areas (max 40°C) on a solid surface to avoid vibration.

Intake Pipe Angling

Angle intake pipe upwards towards the mouth to prevent air locks.

Pipe Support

Use brackets to support pipes and prevent stress on the pump body.

Name Plate Specifications

Ensure electric pump name plate specifications match rated line values.

Pump Rotation Verification

Verify three-phase pump rotation direction (clockwise) and swap phases if incorrect.

Priming Procedure

Prime the pump by filling it completely with clean water through the priming plug.

Freezing and Storage Advice

Empty pump during freezing risk, check foot valve regularly, and store in dry place if unused.