EasyManua.ls Logo

Shini SAL-5HP-UG User Manual

Shini SAL-5HP-UG
33 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
SAL-UG
Separate-vacuum Hopper Loader
Date: Sep. , 2020
Version: Ver.C (English)
Question and Answer IconNeed help?

Do you have a question about the Shini SAL-5HP-UG and is the answer not in the manual?

Shini SAL-5HP-UG Specifications

General IconGeneral
Conveying Distance5 m
Phase3
Insulation ClassF
Hopper Capacity5 liters
Power SupplyElectric
Frequency50 Hz
Altitude1000 m

Summary

Technical Specifications

Specifications

Details technical specifications for various SAL-UG models, including motor power, dimensions, and capacity.

Safety Regulations

Safety Signs and Labels

Explains electrical safety, high voltage warnings, and general caution signs.

Signs and Labels

Details specific labels regarding suction filter maintenance and warranty.

Installation and Debugging

Install the Machine on the Dryer

Details the process of installing the machine onto a dryer.

Installation Elements

Shows a diagram identifying key installation elements like air suction and material suction.

Installation Steps

Provides numbered steps for physically installing the main body, hopper, and connecting pipes.

Power Supply

Specifies the required power supply voltage and frequency for the SAL-UG (E) Series.

Application and Operation

Parameter Setting

Explains how to navigate and set parameters, listing F.01 and F.02.

Communication Address (protocol modbus-RTU)

Trouble-shooting

Maintenance and Repair

Related product manuals