Medium-Voltage Switchgear
Type 8DA, Extendable Fixed-Mounted Circuit-Breaker Switchgear up to 40.5 kV
6LQJOH%XVEDU6LQJOH3ROH0HWDO(QFORVHG0HWDO&ODG6)
,QVXODWHG
0HGLXP9ROWDJH
6ZLWFKJHDU
OPERATING
INSTRUCTIONS
PART 2/2
Installation
2UGHU1R
';%$
6:)
5HYLVLRQ
,VVXH

Other manuals for Siemens 8DA

Question and Answer IconNeed help?

Do you have a question about the Siemens 8DA and is the answer not in the manual?

Siemens 8DA Specifications

General IconGeneral
BrandSiemens
Model8DA
CategoryCircuit breakers
LanguageEnglish

Summary

About these instructions

Scope and Limitations

Provides guidance on the scope and limitations of the manual.

Safety Instructions

Signal Terms and Definitions

Defines signal terms used in the instructions.

Due Application

Explains the intended use and conditions for the switchgear.

Safety Rules

Outlines essential safety rules to be followed during operation and installation.

Qualified Personnel

Defines the qualifications required for personnel handling the switchgear.

5 Unloading and Erecting Transport Units

5.1 Unloading Transport Units

Details the process of unloading transport units from delivery.

5.2 Checking for Completeness and Transport Damage

How to check transport units for completeness and damage.

5.3 Storing Transport Units

Guidelines for storing transport units safely and correctly.

5.4 Transporting Units to Installation Place

Steps for transporting units to their final installation location.

5.5 Setting Down Transport Units at Installation Place

Procedures for setting down transport units at their installation site.

5.6 Aligning the Switchgear

How to properly align the switchgear units.

6 Assembling the Switchgear

6.1 Preparing Busbar Connections

Preparing the busbar connections for assembly.

6.2 Installing the Transport Unit

Procedures for installing a transport unit.

6.3 Installing Further Transport Units

Steps for installing additional transport units.

6.4 Completing Switchgear Installation

Final steps to complete switchgear installation.

7 Installation Work with SF6-Gas Before Voltage Test

7.1 Completing Busbar Installation and Filling with SF6-Gas

Completing busbar installation and filling with SF6 gas.

7.2 Assembling Panel Connections and Filling Circuit-Breaker Housings

Assembling panel connections and filling circuit-breaker housings.

8 Preparing Power-Frequency Voltage Test

8.1 Checking SF6-Gas Filling

Checking SF6 gas filling before voltage test.

8.2 Preparing Busbar System for Voltage Test

Preparing the busbar system for voltage testing.

8.3 Preparing Panel Connections and Cables for Voltage Test

Preparing panel connections and cables for voltage test.

8.4 After Power-Frequency Voltage Test

Actions to take after the power-frequency voltage test.

9 Installation Work with SF6-Gas After Voltage Test

9.1 Installing Solid-Insulated Bars and Filling Circuit-Breaker Housings

Installing solid-insulated bars and filling circuit-breaker housings with SF6.

9.2 Installing Non-Disconnectable Inductive Voltage Transformers

Installing non-disconnectable inductive voltage transformers.

9.3 Installing Disconnectable Voltage Transformers

Procedures for installing disconnectable voltage transformers.

10 Final Installation Work

10.1 Mounting Cables with Plugs

Mounting cables using plugs.

10.2 Connecting Low-Voltage Cables

Connecting low-voltage cables.

10.3 Mounting Metal Covers

Mounting metal covers.

11 Tests

11.1 Checking SF6-Gas Filling

Checking SF6 gas filling and quality.

11.2 Checking Low-Voltage Equipment Circuits

Checking low-voltage circuits and components.

11.3 Checking High-Voltage Connections

Verifying high-voltage connections and earthing.

11.4 Checking Electrical Connections

Checking device and control cable connections.

12 Commissioning

12.1 Checking Installation Work

Performing a final check of installation work.

12.2 Test Operation

Conducting test operations to verify functionality.

12.3 Checking Accessories

Checking switchgear accessories.

12.4 Correcting Circuit Diagrams

Updating circuit diagrams with modifications.

12.5 Instructing Operating Personnel

Training and informing operating personnel.

12.6 Gas Pressure Monitoring

Monitoring SF6 gas pressure after commissioning.